PCS engineering & technical validation
The DOE draft treats materials, devices, packaging and system integration as interdependent parts of wide-bandgap power-electronics development.
U.S. DOE · Draft WBG Strategic Framework, Jan 2025 ↗
×
APG × AXON
Market figures are context. APG × AXON’s real opportunity is built bottom-up from a specific buyer programme, a scoped work package and a documented path to value.
We do not add overlapping global markets together. Each domain is documented through its own forcing function, relevant buyer layer, APG × AXON wedge, evidence and partner-funded next step.
The DOE draft treats materials, devices, packaging and system integration as interdependent parts of wide-bandgap power-electronics development.
U.S. DOE · Draft WBG Strategic Framework, Jan 2025 ↗The IEA projects global data-centre electricity demand to more than double to around 945 TWh per year by 2030, with AI as the largest growth driver.
IEA · Energy and AI, 2025 ↗To meet national climate and energy goals, the IEA estimates that the world needs to add or replace around 80 million kilometres of grids by 2040.
IEA · Electricity Grids and Secure Energy Transitions, 2023 ↗Global sales of medium- and heavy-duty electric trucks exceeded 90,000 in 2024, almost 80% more than the year before. This is demand context, not evidence of MCS deployment.
IEA · Global EV Outlook 2025 ↗From 1 January 2030, passenger and container ships above 5,000 GT at berth must use shore-side power or another zero-emission technology in EU ports covered by AFIR Article 9, subject to the exemptions in the rules.
European Commission · FuelEU Maritime ↗Industry accounts for around 30% of global energy consumption, most of it currently supplied by fossil fuels. Our thesis is that electrification creates new application-specific conversion needs.
IEA · Renewables for Industry, 2025 ↗EU-27 defence-related R&D spending reached €13 billion in 2024; the report estimated €17 billion in 2025, stated in constant 2024 prices.
European Defence Agency · Defence Data 2024–2025 ↗Macro figures document market movement, not APG × AXON’s revenue opportunity. The serviceable opportunity is defined per partner programme. Specific performance, rights, facility and capacity conditions are always confirmed per engagement.
NEXT STEP
Tell us about the system, the specific challenge and the decision you need to make. We can then scope a relevant technical and commercial study.
The links open your email client. Requests for materials are reviewed individually; access is not automatic.